Fast delivery Electrical Contact Rivet – Solid Contact rivet – ZHJ
China Fast delivery Electrical Contact Rivet - Solid Contact rivet - ZHJ Manufacturer and Supplier | ZHJ Detail:
Solid rivets present a larger challenge when de-riveting. The manufactured head must be ground or milled off prior to pushing the rivet back through the hole. When removing solid rivets, the material of the component surrounding the hole must be considered. If the material is softer than the rivet, there is a chance it will be damaged. If the hardness is equal to or harder than the rivet the risk of damage is lower, as it will maintain its shape while the softer rivet is pushed back through. How the rivet was initially formed also plays a role in the de-riveting process. The larger the shank swell created in the forming process, the higher the risk of damage to the surrounding component.
Process flow
Rivet Making
Annealing
Finishing
Inspection
Drawing
Packing
Measure
|
Item |
Head diameter D(mm) |
Head thickness T(mm) |
Foot diameter d(mm) |
Foot length L(mm) |
Sphere radius R(mm) |
| Basic dimension |
1.2~12 |
0.15~3.00 |
0.75~6.00 |
0.45~8.56 |
1.2~40 |
| tolerance |
±0.05 |
-0.02∽ |
-0.02∽ |
±0.05 |
±2 |
Product detail pictures:
Related Product Guide:
Our business puts emphasis over the administration, the introduction of talented staff, plus the construction of employees building, striving hard to boost the standard and liability consciousness of staff members. Our corporation successfully attained IS9001 Certification and European CE Certification of China Fast delivery Electrical Contact Rivet - Solid Contact rivet - ZHJ Manufacturer and Supplier | ZHJ , The product will supply to all over the world, such as: United States , Qatar , Borussia Dortmund , Furthermore, all of our items are manufactured with advanced equipment and strict QC procedures in order to ensure high quality. If you are interested in any of our goods, please don't hesitate to contact us. We will do our best to meet your needs.
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.








